Granite Block to Slab Yield Rate: Why Nobody Can Quote You One Percentage
Granite block to slab yield rate is not a figure you can look up — it is sawing yield × edge-trim yield × sound-slab yield, with a nesting factor added only for cut-to-size work. One 2.80 × 1.60 × 1.50 m Maple Red G562 block holds 6.72 m³; at 30 mm with an 8 mm kerf, sawing alone leaves 78.0%, the first three factors give 66.3% and about 148 m², and 600×600 tiles pull it down to 47.1% and roughly 105 m². The article ends with the three documents you need to check a supplier's number.
How do you calculate granite block to slab yield rate?
There is no fixed percentage to look up. Yield rate is four factors multiplied in order: sawing yield × edge-trim yield × sound-slab yield, plus a fourth factor, nesting yield, only when slabs are cut to fixed sizes. The first three take a block to slabs. Take one Maple Red G562 block, 2.80 × 1.60 × 1.50 m, 6.72 m³, sliced along the 1.50 m direction at 30 mm with an 8 mm kerf. Sawing alone leaves 78.0%. The first three factors give 66.3%, about 148 m² of slab. Cut those same slabs to 600×600, multiply by 71.1%, and you land at 47.1%, about 105 m².
What sits on the top and bottom of that fraction?
The numerator ends up as finished volume, the denominator is block volume. The numerator returns to cubic metres by multiplying finished area by finished thickness: 148.4 m² × 0.03 m = 4.45 m³, divided by 6.72 m³ gives 66.3%. Three definitions must be locked before any number means anything. First, the denominator: outer dimensions on the block card, 2.80 × 1.60 × 1.50, or net volume after missing corners are deducted — half a cubic metre can separate the two. Second, the numerator: net finished area of 148 m², or gross slab area of 158 m² (39 slabs × 4.05), and the gap between them is exactly the rejection rate. Third, thickness: 30 mm finished or 30 mm rough, since polishing can leave 28 mm and a 28 mm basis shrinks the numerator by 6.7%. Leave those open and one block reports four different percentages.
How much does the kerf take first, and why is this part easy to check?
Because only the machine decides it, not the stone and not the order. Slab thickness plus kerf gives the width one slice occupies; block width divided by that gives the slice count; slices × thickness ÷ width is the sawing yield. Here 1500 ÷ 38 = 39 slices, using 1482 mm and leaving 18 mm of waste, and 39 × 30 ÷ 1500 = 78.0%. Put three thicknesses side by side and the pattern is plain: the thinner the slab, the bigger the share the kerf takes. The 8 mm figure is the kerf on our own frame saws; ask any other plant again, because frame, wire and disc saws all differ. One question — how wide is your kerf — and you can run this step yourself.
| Slab thickness | Width per slice | Slices from 1500 mm | Sawing yield |
|---|---|---|---|
| 20 mm | 28 mm | 53 | 70.7% |
| 30 mm | 38 mm | 39 | 78.0% |
| 50 mm | 58 mm | 25 | 83.3% |
How do trimming and defects enter the number?
Trimming is an area ratio, defects are removed by slab count, and both multiply onto the previous result. One sawn slab is 2.80 × 1.60 = 4.48 m²; trimming 50 mm off each edge leaves 2.70 × 1.50 = 4.05 m², which is 90.4%. Defects are taken here as a 6% rejection, covering slabs where colour lines, rust spots or cracks cluster, so the sound rate is 94%. That 6% is an assumption and has to be replaced with your own batch: 2 slabs rejected out of 39 is 94.9%, 3 out of 39 is 92.3%, and each extra slab costs about 2.6 points. Multiply the three: 0.78 × 0.904 × 0.94 = 66.3%, 6.72 × 0.663 = 4.45 m³, divided by 0.03 gives about 148 m². Counting slabs gives the same: 39 × 4.05 × 0.94 = 148.4 m².
Why is there one more factor for cut-to-size slabs?
Because at that stage the waste is set by the layout, not by the stone. A 2700 × 1500 face laid out in 600×600 gives 4 columns × 2 rows = 8 pieces = 2.88 m², and 2.88 ÷ 4.05 = 71.1%. The same face in 600×300 gives 4 columns × 5 rows = 20 pieces = 3.6 m², or 88.9%. Both layouts leave the same 300 mm strip on the 2700 mm edge (0.45 m²), so it cancels; the full 17.8 points come from the 2400 × 300 strip on the 1500 mm edge — 0.72 ÷ 4.05 = 17.8%. So cut-to-size yield = 0.663 × 0.711 = 47.1%, area 148 × 0.711 = about 105 m²; the same block in 600×300 gives 148 × 0.889 = about 132 m², a 27 m² difference. On our 346 m² per 20 ft container, 105 m² fills about a third of a box. This factor is geometry only and does not deduct the second kerf at the cut-to-size saw, so real output is slightly lower.
What three documents do you need to reconcile with a supplier?
Three, and missing any one makes the sum impossible to redo. First, the block number, so you know which block these slabs came from — a block A sheet checked against block B goods proves nothing. Second, the three dimensions on the block card, written in full and marked as outer or net of missing corners. Third, the list of what came out of that block: size × piece count × area, plus the number of rejected pieces. When the three line up you can walk the 66.3% and 47.1% steps yourself, and any step that will not walk is a question to settle before the order. One sentence also belongs in the quotation: whether pricing is per finished square metre or per cubic metre fed in. The reverse formula is in the article linked at the end.