Can I change granite size after deposit? The cut-off is sawing, not payment
Yes, you can change granite size after deposit, but the cut-off is sawing, not the payment date. The deposit reserves a block for your order, not a set of dimensions. Before the saw, a change is one line on the cutting list; after it, a change means cutting a new panel. This breaks the decision into four stages and the documents each one reissues.
Can I change granite size after deposit, or is the deposit final?
Yes, you can, but the cut-off is sawing, not payment. The deposit reserves that block for your order; it does not fix the dimensions. Once the money lands, the stone belongs to this order, while the size on the cutting list is still open. Before the block reaches the saw, a size change is one line on the cutting list: the layout drawing is re-nested once and the saw follows the new sheet. After sawing starts, you are no longer editing numbers. Shrink a panel and the strip that comes off only stays material if another piece can take it. Enlarge one and the original panel is too short, so a new panel is cut. So the useful question is not whether the deposit blocks a change, but whether your block has been sawn. Answer that first and the cost conversation starts from the same point.
Can my order still be changed? Three questions locate it, a fourth settles the deposit.
Three questions: has my block been sawn; which revision of the cutting list is live; which documents get reissued afterwards. The answers place your order in one row of the table below. There is one dividing line, and it is sawing, not payment. Ask one more thing at the same time: is this change handled as a variation to the existing order, or as a new order? As a variation, the deposit stays against this order and is not collected again. As a new order, you will usually be asked for a second deposit, and how much of the first one can be offset depends on whether that block has been touched: untouched, offsetting is negotiable; already sawn, it offsets stone and labour already spent. Either way, the offset and any refund belong in the payment terms of the new order, not in a verbal understanding.
| What can still change | Where the cost lands | Which document is reissued |
|---|---|---|
| 1. Deposit paid, no cutting list yet: size, edge profile, quantity, surface finish all move | Factory side; no labour booked, though a drop below the minimum batch reopens the unit rate | First issue of the cutting list |
| 2. Cutting list issued, block not sawn: size and edges move, the layout is re-nested once | One more nesting pass and machine setting | Cutting list in a new revision, layout drawing redrawn |
| 3. Sawing started: only pieces not yet cut can move | Panels and strips already cut stay on your order | Cutting list in a new revision, packing list redrawn |
| 4. Edging or packing done: size is fixed, only packing and shipping order move | Unpack and repack, or make the difference as a supplementary lot | Packing list and shipping marks reissued, plus a supplementary lot note |
Why is shrinking an order not the same as enlarging it?
Because the cost lands in different places. Shrink it and the finished area falls, but the billed area does not always follow. Priced by finished area, less area means a lower bill; priced by slab area consumed, once the slab has been cut to the old size, the finished area falls and the billed area does not. Ask which basis applies before ordering and write it into the order. Whether the offcut is still stock depends on the layout: a 600×300 strip is material only if a second piece can use it, otherwise it is waste. Area can also fall below the 100 ㎡ minimum, and the fixed cost of sawing, setting and nesting then spreads over fewer square metres, so the unit rate has to be renegotiated. Enlarging needs more stone from the same block. If that block cannot cover it, the order crosses to another block, and the colour may not match; acceptance is covered in a separate article. One calculation is enough: 600×600 to 600×300 halves the area, while 620×620 makes every 600 grid unusable, so the layout is nested again from scratch rather than pushed sideways.
Which documents have to be reissued after a size change?
Four: the cutting list, the layout drawing with piece numbers, the packing list with shipping marks, and the specification fields on customs and settlement documents. The cutting list is the sheet the workshop works from. The layout drawing decides which panel goes to which number, so a size change forces renumbering. The packing list and shipping marks decide how a crate is found at the destination port. The specification fields on customs and settlement documents have to match what actually ships, or an inspection turns into an argument. One email saying "make it 600×300" will not stop the workshop running the old cutting list; that is a process gap, not an attitude problem. Put the change on a written variation order with a revision number and a date, signed back by both sides, and void the old revision so two versions never circulate on the floor.
Will a size change push the lead time and disturb the container plan?
Yes, depending on what you change. Maple Red G562 (GB G4562) is stocked as 30mm polished slab, and the 5-day lead time refers to that stocked specification. Turn the order into cut-to-size and it stops being a stock slab sale and becomes made to order, so the lead time is quoted against the schedule at that moment and the 5 days no longer applies. Loading works the same way: 346 ㎡ per 20ft container is the flat-stacked slab figure. Cut-to-size pieces ship upright in crates and a container holds less than that, so do not divide the new area by 346; give the packing method and crate dimensions to the forwarder and have the load planned. That 346 figure is itself set by weight: at 2.7 t/m³ a 30mm panel is about 81 kg per square metre, so 346 ㎡ comes to about 28 tonnes before crates are counted, already against the payload line of a 20ft container. For cut-to-size loads, tonnage cannot be estimated from the 346 ㎡ figure; work it out from crate count and crate size. Before enlarging, do two sums: how many square metres, and how many tonnes.
How do I write the order so a change stays possible later?
Four clauses in the body of the order, not in the remarks. One, the change window: "Free changes to size, edge profile and quantity are accepted up to the day before the cutting list is issued; later changes fall under the variation clause." Two, pricing past the window: "Changes requested after the window are priced on labour hours already booked and area already cut, with the amount confirmed in writing before work proceeds." Three, block retention: "The block reserved for this contract is held for ___ days from receipt of the deposit; storage and re-nesting after that date are charged separately." Four, written variation: "Any size change takes effect only through a variation order signed back by both parties with a revision number and date; email and chat records are not a basis for execution." All four can be copied as written; fill the blank with your own schedule.