How to Check a Granite Packing List on Arrival: Count Crates First, Open Second

Checking a granite packing list on arrival follows one fixed order: count crates, read crate numbers, walk the outside for damage, then open and count pieces. A break in the number sequence means one crate short, and a matching total does not cancel it. Verify square meters from pieces: 600×600 is 0.36 ㎡ a slab, 30 slabs to a crate is 10.8 ㎡, 20 crates is 216 ㎡. Weigh last, not first.

Checking a granite packing list on arrival: count the crates or open them first?

Count first, open second. Once the doors are open and slabs start moving, the link between a number and a crate falls apart: the number plate is nailed to the side panel and opening a crate starts with pulling that panel off, so the number leaves with it; crates get shifted and a break in the sequence can no longer be traced. The carrier only looks at the outside anyway, because what he signs for is whether crates are present or damaged, not what is inside. So the order is fixed in four steps: count crates, read the numbers aloud, walk the perimeter for damage, and only then touch the first slab. Count by column, once across and once down. Read the numbers from 1 to N straight off the list, pointing at each crate as you go. Note any torn board, water stain, snapped strapping or collapsed corner with its crate number and photograph it. On a big lot two people work the rows: one reads the numbers, one points at crates, and no slab moves until the count is done.

The six columns on the packing list: what do you check each one against?

Each column is checked against something different. The list was filled in when the factory closed the crates; what you hold is a crate and a tape measure, not the list again. Crate number against the stencil on the crate, piece count against one opened crate, spec against a tape on the same slab, square meters back-calculated as pieces times slab area, weight against the loaded truck on a weighbridge, outer size against one measured crate. Only two of the six have to be checked crate by crate: the number and the crate count. The rest can be sampled, and the sample should be pointed at at random in the stack, not the crate with its face up and the number in plain sight. If a sample fails, widen it to the whole lot. Sampling settles only half the question: crates that pass inside and out show the batch is probably fine, but they prove nothing about the crates you did not open. So state the result in two sentences — all crate numbers present; N crates sampled, no discrepancy — and never as “the whole lot passed”.

ColumnWhat the list saysWhat you check againstWhat a mismatch means
Crate no.C/NO.1-20Number stencilled on the crateMissing or duplicated number
Pieces per crate30 pcsOpen one crate and countShort-packed or mis-typed
Spec600×600×30, polishedTape on the same slabWrong cut or mixed spec
Square meters216 ㎡Pieces × 0.36 ㎡Piece count or slab area is off
Net / gross weightNet 17.5 t; gross = net + weighed empty crateWeigh loaded, weigh empty, subtractA few hundred kilos → recount crates
Crate sizeOne L×W×H per crateMeasure one crateCrate type mixed or old template copied

What does a missing or duplicated crate number tell you?

A gap means one crate short, so do not start pulling other crates apart to look for it. Line the crates up in the order printed on the list and read from 1 to 20. Pull the absent number out on its own, photograph the occupied slot together with the empty one, then work out whether that crate never loaded or went somewhere else. A duplicate is two crates with the same number, and you have to separate a labelling mistake from a real double: read the stack again and compare the number that appears twice with the number that is absent. Duplicate with nothing missing is a mislabel, so re-mark and re-shoot it. Duplicate plus a gap means one crate is carrying the number of two, and that crate most likely never made it onto the vessel. One more thing slips through easily: never let the total cancel a gap. Written as 19 crates plus 1 duplicate, the count is still 20, but one crate is not on the list, and neither a replacement claim nor a shortage claim has a leg to stand on.

How do you verify the square meters from the piece count?

Three steps. A 600×600 slab is 0.6 times 0.6, so 0.36 ㎡. A crate of 30 slabs is 10.8 ㎡. 20 crates is 216 ㎡. If the list says 216 it ties out; if it says 210 or 220, one link is wrong. The premise matters: the square meters on the list must come from cutting sizes, never from the visible face on a laying plan, which runs systematically small. Then run the division on the nominal figure only: pieces times 0.36 gives the area that should be there, and the gap divided by 0.36 gives a whole number for a piece-count error (3.6 ㎡ is 10 slabs, 7.2 ㎡ is 20), the only case that counts as short-packed. A fraction means it is not pieces at all, because whole slabs cannot add up to that gap, so the fault sits in the per-slab area on the list. Direction reads the same way: 216 against 210 counted is a 6 ㎡ gap that does not divide, so the list over-states the area, and the reverse means it under-states it; both are corrections to the list. Use the measured length and width only to judge whether a slab is 600×600 — multiply it by pieces first and a 599 slab invents two missing pieces. Write the three figures — pieces counted, area per slab, total area — in the margin of the list, so whoever re-checks follows the same path.

The truck weighs a few dozen kilos less than the gross weight on the list. Is that a shortage?

No. The comparison is against the gross weight column, not the net, and the ticket reads truck plus cargo: weigh loaded, weigh empty, subtract, and the difference is the cargo. A weighbridge has a scale interval and timber moisture keeps moving, so a few dozen kilos sits at those two ends and is not missing stone. A few hundred kilos should stop you looking at the scale: 216 ㎡ in 20 crates is 10.8 ㎡ a crate, times 0.081 tonnes per square meter, the net weight of one square meter of 30 mm slab, so one crate nets 0.875 tonnes. At that size recount crates and pieces instead of matching the gap to one crate. Fix the order: crate numbers and count first, pieces per crate second, weighbridge last — weight is the cross-check, not the opening move.

Why can't damage to the crate and a shortage inside it go on the same document?

Two documents, two subjects, and they cannot be merged. The carrier's delivery receipt covers the outside of the crate only: torn boards, water stains, broken strapping, a collapsed corner. Before signing, write the damaged crate numbers on the receipt, photograph each one, and note that the packaging is damaged and the contents are unchecked. Do not sign clean. Once you sign clean, a cracked slab found after opening meets the carrier's answer that the goods were sound on delivery, and that is the end of it. A shortage inside the crate is the shipper's account and needs its own arrival check record: crate number, pieces expected, pieces received, the difference, and photographs, all sent in one go. Mix the two on one form and the carrier says it is not his scope while the supplier says you already signed, so neither side accepts it. Timing: finish the routine inside the free periods. While the box still sits at the terminal it is storage; once it is out and the empty is not back it is detention, and either one runs by the day past its window.