Granite Paving Grout per Square Meter: Count Joint Meters First, Then the Area
Granite paving grout per square meter is 0.5 L for 600×600 slabs with a 5 mm joint filled to 30 mm; 300×600 needs 0.75 L. Volume = joint length per m² × joint width × joint depth, with joint length = 1/L + 1/W, then converted to bags by the coverage printed on the bag.
How much granite paving grout do I need per square meter? Start with the joint length
With 600×600 slabs, a 5 mm joint and 30 mm depth, one square meter takes 0.50 L. The calculation has three steps. First find the joint length in one square meter: k = 1/L + 1/W, with L and W in meters, which gives 3.33 m for a 600×600 slab. Multiply by joint width and depth: 3.33 × 0.005 × 0.03 = 0.0005 m³. Multiply by 1000 to get liters: 0.50 L. Measure joint length on the nominal slab size, and do not add the few millimeters of joint width to the slab length. The joint width itself is set in our separate guide on paving joint width; fix the width first, then run this calculation.
Why can't I multiply the area by one fixed figure?
Because all three multipliers move: slab size sets the joint length, and joint width and joint depth are separate choices. At the same 5 mm width and 30 mm depth, change the slab size and the figure changes with it. Smaller slabs put more joint length into a square meter, so consumption rises: 300×600 has 1.5 times the joint length and 1.5 times the grout of 600×600, and 400×400 also gives 5.00 m; the table lists three common sizes only, so run any other size through the same formula before multiplying by area.
| Slab size | Joint length per m² (m) | 3 mm joint (L/m²) | 5 mm joint (L/m²) | 8 mm joint (L/m²) |
|---|---|---|---|---|
| 600×600 | 3.33 | 0.30 | 0.50 | 0.80 |
| 300×600 | 5.00 | 0.45 | 0.75 | 1.20 |
| 1000×600 | 2.67 | 0.24 | 0.40 | 0.64 |
What joint depth should I use, and what changes if I fill 20 mm instead of 30 mm?
The depth is capped by the slab: 30 mm. Use the depth actually filled, not the slab thickness by default. A 600×600 slab with a 5 mm joint filled to 30 mm takes 0.50 L; filled to 20 mm — an example, and a common way to save material on site — it takes 0.33 L. The material saved by shallow filling comes back as topping-up on vehicle areas and wherever sand settles: refilling that 10 mm uses what you saved. So stock pedestrian sand-filled joints at full depth, and do not leave vehicle joints shallow. Measure depth with a rule down in the joint, not by eye at the slab edge.
How do I convert liters to bags, and why not estimate volume from dry powder weight?
Convert with the coverage printed on the bag: divide your total area by the square meters one bag covers and round up; if you already have the per-square-meter figure, that square-meter coverage can be turned into liters per bag first. The coverage printed on the bag assumes the manufacturer's default joint width and depth, while your joints are 30 mm deep; after dividing the area, cross-check the bag count against liters per bag from your per-square-meter figure, and if the two diverge, buy on the liter figure and ask the supplier which joint size the bag figure assumes. Do not back-calculate volume from dry weight. A different water ratio gives a different volume of mortar from the same bag, so a weight-based estimate drifts. As a rough check, mixed mortar at about 2 t/m³ means 1 L weighs about 2 kg — that is an estimate; the bag's water ratio and coverage figure govern the bag count. If you are unsure, fill 1 m² as a trial, measuring the mortar in a jug or weighing the material before and after; that number fits your mix better than an estimate. If the bag does not print a coverage figure, ask the supplier for the area one bag covers; do not guess it.
How much do I buy for a whole order? Area times unit consumption, plus topping-up
Multiply area by unit consumption, then add the topping-up volume. Slabs start at 100 m², so the smallest order is 100 × 0.5 = 50 L at 600×600, 5 mm, 30 mm deep, rounded up to whole bags. A 20 ft container from our works holds 346 m² of Sesame Grey G602, and the same conditions give 173 L, enough to fill the joints of every slab in that container. Sesame Grey G602 is held in stock in 30 mm and ships in 5 days; fix the slab order first, then buy the grout on the liter figure above. Size the topping-up by how many passes you plan and how many square meters each covers: one pass after completion over 20 m², for example, adds 20 × 0.5 = 10 L. The result is grout in the joint, before the material left on bucket walls and slab faces. Do not set the topping-up as a percentage; add the square meters you can point to on site.
How do I fill the joints on site without waste? Five actions
Done in this order, the grout ends up in the joint rather than on the slab. One: sweep and blow the joint clean, because dust left in it makes the grout bond to dirt. Two: mix on the stiff side, since a wet mix flows further but shrinks more and leaves a hollow at the joint face. Three: fill slightly below the slab surface, as anything proud of the face is removed by later cleaning. Four: do not wash the surface before initial set, because water carries the fines out of the grout. Five: top up after rain, once settled sand has dropped the level. Do not use neat cement paste at any stage — it shrinks and cracks, and the repair is to rake out and refill; use sand in the mix or the manufacturer's ratio, with the ratio taken from the bag.