How Often to Reseal Granite? Judge by Water, Not by the Calendar
There is no universal answer to how often to reseal granite. A sealer has failed when it stops repelling water, not when a set number of years has passed. Our site method is two drops on the same slab: one spot that takes the traffic, one sheltered corner nobody walks on. Dark stones such as Sesame Black G654 barely change colour when wet, so watch how fast the drop spreads.
How often should granite be resealed — is there a number I can copy?
No universal interval exists, and any figure you are quoted reflects someone else’s project, not your slab. A sealer fails when it stops repelling water, not when a calendar page turns. Take one batch of paving: step treads get walked on, pool coping gets splashed, a ventilated facade only sees rain. After the same period the three are in three different states. So we do not quote a lifespan. We give the client a test they can run: if the drop still beads and sits, the sealer is holding; if it darkens and sinks in quickly, put that area on the schedule. A sealer is a consumable, not a one-off treatment.
When a sealer fails, is the surface film worn off or is the penetrating layer thinned?
It depends on the type, and the two fail differently. A penetrating sealer goes into the pores and lines their walls; wear thins that lining, so the first sign is a patch that stops beading while the face still looks sound. A film-forming sealer builds a layer on top; it fails by wearing through, lifting or chalking, and water enters at the break. A penetrating sealer can be recoated once the stone is clean and dry. A film-forming sealer cannot: if the old film is not stripped, the new coat bonds to it, and when the old film lifts it takes the new one with it. Identify the type before you buy anything; get the wrong one and you pay for the material and the labour twice.
| What to compare | Penetrating sealer | Film-forming sealer |
|---|---|---|
| How it fails | The water-repellent lining inside the pores wears thin; patches stop beading while the face still looks intact | The surface film wears through, lifts or chalks; water enters straight at the break |
| Can you coat straight over it? | Yes, once the stone is clean and dry | No — an old film left in place will lift and take the new coat with it |
| Before recoating | Wash off soap scum, oil and residue, let the stone dry, apply at the stated coverage rate | Strip the old film until water no longer sits in a sheet and the surface is not slick, then clean, dry and apply |
How do I tell that a slab is due for resealing?
This is how we do it on site. Pick two spots on the same slab: one that takes the wear, such as the middle of a step or a doorway, and one in a sheltered corner that has never been walked on. Put a few drops on each and watch two things — whether they bead, and how long before they spread and sink. A large gap between them means the surface has worn unevenly and that area is due; if both drink the water at once, the whole face has gone. Dark stone is the trap: Sesame Black G654 hardly changes colour when it takes water, so judge by how fast the drop spreads and how the reflection shifts, not by the shade. Do not test right after rain or washing, because a damp surface skews the result. Mark both spots so the next test lands in the same place; a reading taken somewhere else cannot be compared with the first. Two spots, one variable: wear.
Why does one part of a project need resealing long before another?
Because the wear and the water arrive at different rates. Paving is abraded by shoes and trolley wheels and washed with detergent; the strip in front of a kitchen sink takes splash and wiping every day; a ventilated facade only sees rain, but wind drives that rain into the joints; pool coping and planter capping stay damp and carry salt or fertiliser. One batch of 30mm slabs, split between steps, plaza and pool edge, cannot age in step. The spots worn hardest and wetted most are the ones to inspect first. Keep the inspection sheet one row per location, each with its own date; do not write one date for the whole building.
| Location | What wears it or feeds it water | When to inspect |
|---|---|---|
| External paving and steps | Shoes, trolley wheels, grit, periodic washing | Every inspection round, start with the busiest line of travel and the step nosings |
| Kitchen worktop in front of the sink | Daily splash, repeated wiping, dish liquid | Start with the band around the sink and the front edge |
| Ventilated facade | Rain only, but wind drives it into the joints | After the wet and windy season, check joints and panel edges |
| Pool coping and planter capping | Standing water, pool chemicals, soil and fertiliser | Before and after the pool season, focus on the horizontal face |
Which four steps cannot be skipped before recoating?
Four steps, and skipping any one undermines the whole coat. First, clean: soap scum, oil and detergent residue have to come off, because sealer applied over oil bonds to the oil, not to the stone. Second, dry: sealer over a damp slab traps water underneath and never anchors. Third, on a film-forming system, strip the old film until water no longer sits in a continuous sheet and the surface is not slick under the hand. Fourth, test on one or two inconspicuous pieces to see whether the colour deepens and how long it takes to dry before you commit the whole area. Keep the test piece on site; it is the control for sign-off.
How soon can it get wet, and how is the work signed off?
The curing time comes from the datasheet of that batch. Formulations differ, so do not copy hours from another job. Until it is cured, keep water, rain and plastic sheeting off it, and keep people from walking on it. Sign-off is not by touch. Repeat the drip test from section 3 side by side: one treated spot and the untreated control sample kept from the same batch. If the treated spot beads and holds while the control still drinks, the product is in the stone. Cloudiness, brush marks or missed edges get fixed on the spot. If rain arrives before curing finishes, recoat that area rather than assume it will recover. On the sign-off sheet, record which spot was tested and when.
How do I get the next reseal into the maintenance file?
Record six things: product name and batch, coverage rate, number of coats, application date, the result of every drip test, and one control sample kept on site. Trigger the next job on the test result, not on a fixed interval: when a spot starts spreading water noticeably faster, that spot alone goes on the schedule. The control sample is the reference for the next comparison and for colour when a new batch arrives. Miss one of the six and the next decision rests on guesswork. File the sheet with the handover documents so it survives a change of property manager. How the work is priced per square metre belongs to our separate article; this one stays on timing.
